Avondale Office Build – removing interior walls

The original floor plan layout of the station is unknown.  After many alterations, the existing interiors had been severely damaged by water infiltration.  The interior stud walls were most likely installed in the mid to late 1940’s and several areas of the exterior walls had been patched and re plastered.  Removal of the walls was essential to the restoration because it allowed for the next phase- removing the flooring system.